Current Position: Senior Project Controls Manager Education
MSc,
International Construction Management, Nanyang Technological University,
Singapore BASc (Hons),
Construction Management, RMIT University, Australia DCE, Diploma
in Civil Engineering, Andhra Pradesh State Board of Technical Education,
India Professional
Registrations/ Certifications
PMP –
Certified Project Management Professional, PMI, USA PMI-SP –
Certified Scheduling Professional, PMI, USA PMI-RMP – Risk
Management Professional, PMI, USA CCP- Certified
Cost Professional, AACEI, USA Distinguishing
Qualifications
§ Program management professional with more than 25 years of
extensive and diversified experience on major programs and projects around
the world that includes the Metrolinx’s RTI Program (Light Rail and Bus Rapid
Transit Program), the Panama Canal Expansion Program, the Masdar City, the
Palm Jumeirah, and Changi Water Reclamation Program. § Specialized in planning, scheduling, estimating, change
management, cost control, contract administration, risk management,
communication management, earned value management and construction
management. Relevant
Experience
§ Dinesh is currently based in the Toronto office under the
transportation business group. He offers a unique combination of skills
demonstrated through the achievements of results in leading and performing a
full range of program/project management and control functions including
oversight, direction, training in the areas of planning and scheduling, cost
engineering, performance measurement, change management, earn value
management, document management, risk management, construction management and
claims management. Representative
Projects and Dates of Involvement
Manager, Project Controls; Metrolinx Rapid
Transit Implementation (RTI) LRT Program; Client: Metrolinx, Toronto, Canada;
CAD$9. 6 billion; 2011- ongoing. This is the
Metrolinx’s 5 in 10 plan which includes Eglinton Crosstown LRT, Scarborough
LRT, Finch West LRT, Sheppard East LRT, and Viva BRT Projects. Responsible
for: managing project controls activities for the program including
preparation of work break down structure and coding structures; preparation,
establishment and maintenance of the integrated master schedules for all the
projects; monitoring and evaluation of work progress against the target
schedule and highlight any deviations for necessary action; evaluation and
recommendation of contractors and consultant schedules; setting up and
recommendation of contract milestones and durations; earned value management;
preparation and establishment of the project controls procedures and
specifications; liaising with all the project stakeholders and project
managers in managing project controls activities; leading the set up and
integration of project management systems; preparation of cost and schedule
estimates; preparation of monthly progress reports; providing advice on the
document control management; preparation of what-if scenarios and related
reports; change management, evaluation and recommendation of extension of
time claims; cost and schedule risk analysis and management; managing and
mentoring a team of project controls professionals. Scheduling Lead; Union Pearson Express;
Metrolinx; Toronto, Canada; CAD$456 Millions; 2011-ongoing. From Toronto Union Station, the UP Express will head northwest along
the existing GO Transit Kitchener line. This 22-kilometer section of track
between Bathurst Street and Highway 427 is being upgraded as part of GO's
Georgetown South Project, which is improving infrastructure along the to
accommodate the UP Express, current and future GO Transit, Canadian National,
and Via Rail services. Beyond the 427, a newly constructed 3.3 km (2.1 mi)
rail spur will carry the UP Express to Toronto Pearson International Airport
Terminal 1. The Union Pearson Express fleet will consist of six trains; each one
composed of three diesel multiple units (DMU) cars, for a total of 18 DMUs.
Dinesh was responsible for leading the planning and scheduling activities
which include setting up the master schedule maintaining, updating and
communicating the master schedule on a regular basis. Scheduling Manager; The Panama Canal Expansion
Program; Client: Canal De Panama, Republic of Panama; US$3. 2billion;
2009-2011.This project scope includes blasting
(basalt – 5.3 million m3), excavation (35 million m3), dredging (13.5 million
m3), concrete (4.8 million m3), dams, water saving basins, coffer dams,
access and hauling roads, ocean side barge loading/unloading docks,
industrial plants, operations, maintenance and control buildings, and
installation of gates and valves. In charge of all the planning and
scheduling activities of the $3.2 billion Third Set of Locks project of the
$5.3 billion Panama Canal Expansion Program. Responsible for the preparation
and establishment of the integrated program master schedule; evaluation and
acceptance of the design and build contractor’s baseline schedules and
monthly updates; evaluation of the contractors’ schedule performance and
preparation of forecast reports; preparation and establishment of the
scheduling procedures and program controls procedures; monitoring
trends/risks/issues; leading and supervising a team of scheduling
professionals; mentoring and training client staff; contract management;
schedule delay analysis and claims evaluation; carrying out risk analysis
using Pertmaster Risk Expert; participating in the payment evaluation
process; change management; and carrying out earned value analysis. Experience Prior to CH2M HILL
Planning and Controls Manager/Assistant Project
Manager; Masdar Development, Client: Abu Dhabi Future Energy Company; Abu
Dhabi, UAE; $19 Billions; 2007-2009. This six
square kilometer city relies entirely on solar energy and other renewable
energy sources, with a sustainable, zero-carbon, zero-waste and will be a car
free city. The travel will be accomplished within the city via public mass
transit and personal rapid transit (PRT) systems, with existing road ways
connecting to other locations outside the city. Dinesh was part of the
project management team managing the 1st phase of the city which involves construction of Masdar Institute of
Science and Technology (MIST); responsible for managing planning, scheduling,
estimating, cost, change and claims, document controls, progress reporting,
and risk management activities. Planning Manager; Qasr Al Hosn Redevelopment
Project; Client: ADACH; Abu Dhabi, UAE; 3 billion; 2007. This project involves rehabilitation of oldest stone building in Abu
Dhabi and addition of new buildings as a hotel, offices and retail. Dinesh
was part of the project management team involved in the preparation of
initial plans and the master schedule. Planning Manager; Al Reem Island; Client:
Macquarie Bank/Tamouh; Abu Dhabi, UAE; $30 billion; 2007. Al Reem Island is a residential, commercial and business project on Al
Reem Island. Overall dimensions of the project are 6.5 million square meters.
Dinesh was responsible for the preparation of estimates and budgets, initial
plans and schedules, setting up project controls systems and procedures, cost
estimates for Macquarie Bank who was trying to carry out the infrastructure
(utilities, chilled water plants, sewage treatment plants and bridges) on
design, built, operate and maintain basis. Lead Scheduler; Abu Dhabi Airport Expansion;
Supervision Committee for Expansion of the Abu Dhabi International Airport
(SCADIA); Abu Dhabi, UAE, US$6. 8 billion; 2007. This project involves the extension of Terminal 1, new air traffic
control tower, new runways and new midfield terminal. Responsible for setting
up master schedules, managing contractor and consultant schedules. Project Controls Manager; Buildings by Daman;
Client: Daman Real Estate Capital Partners Ltd; Dubai, UAE; $436 millions;
2007. This project consists of a 65 story
residential, hotel and serviced apartment tower, and a 12 story office and
retail building. Dinesh was responsible for setting up the master schedule
and project control procedures. Project Controls Manager /Assistant Project
Manager; Capital Tower, Client: Capital
Investments; Dubai, UAE; $110 millions, 2006-2007. This project consists
of two components: a five-star deluxe hotel and serviced apartments and long
lease residential apartment units. Responsible for assisting the project
manager in managing all the aspects of the project; managing the site
supervision consultants and the contractor in delivering the project in
accordance with the contract documents and the client requirements that
include schedule management; cost management; document controls, contract,
change and claims management, risk management. Project Controls Specialist; The Palm Jumeirah; Client: Nakheel;
Dubai, UAE; $20 billion; 2004-2006. The Palm
Jumeirah is a man-made island of around 5 km2 size. This island is in the shape of
a palm tree and consists of detached houses, residential apartments,
five-star hotels and marinas. Dinesh was part of the program management team
who was managing the infrastructure works (Roads, bridges, utilities, sewage
treatment plant, desalination plant, substations, monorail system, etc.)
Responsible for estimating, budgeting, cost control, scheduling that include
managing the contractors and consultants, change management, analysis and
recommendation on cost and schedule impacts. Lead
Scheduler/ Senior Project Controls Engineer, Changi Water Reclamation Plant
(Contracts C4C, C4B and EP3); Public Utilities Board (PUB); Singapore; S$600
millions; 2003-2004. This plant has a capacity
(Phase 1) to treat up to 800,000 m3/day of used water from homes, industries
and businesses per day. It will eventually be able to handle an ultimate
capacity of 2.4million m3 per day. This plant consists of four major
components: influent pumping station (IPS), liquid process facilities, solid
processing facilities and an outfall. Dinesh worked with one of the major
contractor (Sembawang Engineers & Constructors) who had four contracts
with the Public Utilities Board: Contract C3B- Construction of Liquids Module
2, civil works and scrapers, Contract C4B – Civil, mechanical and electrical
works associated with the Solids Building for thickening, dewatering
centrifuges, thermal sludge drying and storage operations, Contract C4C –
Construction of digesters (capacity -20,000m3/each, 5Nos), gallery, gas storage tanks,
digester gas burners including supply & installation of M&E works,
Contract EP3 – Design, supply, install, commission and operation &
maintenance of the sludge drying systems based on rotary drum technology. He
was responsible for preparation of micro contractor schedules; submitting and
obtaining approvals of baseline schedules; maintenance and updates of the
schedules; preparation of delay analysis and claims, involved in claims
negotiations and construction management; preparation of weekly and monthly
reports; involved in the preparation of payment applications; cash flow analysis. Project
Controls Engineer, Singapore; 2000-2002.
Involved in the tenders of the following projects from the contractor side,
responsible for preparation of construction methodology, schedules for the
bids, estimating, cost analysis, pricing: § Biopolis – A premier research center for biomedical
science research, Singapore § NTUC HQ- a 32 storey tower with 48,000m2 prime office
space, Singapore § Maritime Square Development - A major shopping
complex, Singapore § Terminal 3 Changi Airport. This has 28 aerobridge gates
with eight capable of handling the Airbus A380, Singapore § Terminal 2 Changi Airport (A&A works) - This involves
alterations and additions works, Singapore § Evelyn Condominium – this is a condominium complex,
Singapore §
KPE 423
expressway. This involves construction of Kallang/Paya Lebar Expressway,
Singapore Construction
Manager; Mayfair Condominium; Client: Kepple Land;
Singapore; S$89 millions; 1998-2000. This project is a Luxurious
condominium facility consisting of 452 residential units in four blocks of 20
storey high. Responsible for implementing the construction work in accordance
with the contract documents and the deadlines; managing the subcontractor
works, managing a pool of direct workers, construction planning, scheduling
and logistics, construction material estimates and deliveries; the defect
liability period; final invoicing and closing. Construction Manager; Pebble Bay Condominium;
Client: Kepple Land; Singapore; S$180 millions; 1995 1998. This project is a 20 storey luxury waterfront condominium facility
consisting of 510 residential units with 20 different designs in sizes
ranging from 850 sqf to 6,114 sqf. Responsible for implementing the
construction work in accordance with the contract documents and the
deadlines; managing the subcontractor works, managing a pool of direct
workers, construction planning, scheduling and logistics, construction
material estimates and deliveries; defect liability period; final invoicing
and closing. Construction Manager; Tanjong Ria Condominium;
Client: Hong Leong Holdings; S$50 millions; 2001-2002. A luxurious condominium facility consisting of 200 residential
units. Responsible for the defect liability period, final accounts and
closing. Site Engineer/ Project Manager; Sujatha Nagar Township Development;
Bharat Heavy Plates and Vessel Building Society; Visakhapatnam, India;
1992-1995. This project involves construction of a major
residential colony of around 100 acre size consisting of 500 detached housing
units, roads, culverts, retaining structures, drainage system, overhead water
tanks and water distribution system. Dinesh was in charge of the whole
project managing two big contractors and a team of site supervisory staff in
completing the project in accordance with the client requirements. Site Engineer; Terrace houses and a school building; Nellore, India;
1990-1992. This involves construction of residential
building and a school complex on design and built basis. Site Engineer, Kakatiya Canal Project; Public
Works Department; Warangal, India; 1989-1990. This program involves construction of major irrigation structures such
as bridges, canal lining, tank bunds, and causeways across the Kakatiya
Canal. Responsible for executing the construction work in accordance with the
contract documents, preparation of estimates; preparation of invoices and
evaluating subcontractor invoices. Specialized
Computer Skills
§ Microsoft Office:
Excel, Word, Power Point, Access and Visio § Project Management Softwares: Primavera Project Planner P3, Primavera P6 Professional
Project Management (Ver.8.3), Microsoft Project 2013, Primavera Risk
Analysis, Suretrak and Asta Powerproject, Ecosys Enterprise Project Controls,
Primavera Contract Management, Tilos. § Estimating Softwares:
Timerline, Success Estimating and WinEst § Document Control Software: PB Share, Primavera Contracts Management and Aconex § Risk Analysis Software:
@RISK and Primavera Risk Analysis § Drafting Softwares:
AutoCAD (very basic) and AutoCAD Navisworks (basic for schedule simulation) Languages
English,
Hindi, Telugu, Tamil (novice) Supplemental
Information
Years
Experience Prior to CH2M HILL: 21 years CH2M HILL Hire Date: August 25, 2009 Employment
History
2009 to date, Senior Project Controls Manager (PCM3), CH2M Hill,
Toronto, ON, Canada 2007 to 2009, Planning and Controls Manager, Parsons Brinckerhoff, Abu
Dhabi, UAE 2006 to 2007, Project Controls Manager, Hill International, Dubai, UAE 2004 to 2006, Project Controls Specialist, Parsons Brinckerhoff,
Dubai, UAE 2003 to 2004, Lead Planner/ Senior Scheduler, SembCorp E&C,
Singapore 1995 to 2003, Construction Manager/Site Engineer, Samsung Corporation,
Singapore 1992 to 1995, Site Engineer, BHPVHBS, Visakhapatnam, AP, India 1990 to 1992, Site Engineer, Shikhara/ PABC, Nellore, AP, India 1989 to 1990, Site Engineer, K. Venkateswarlu & Co, Warangal, AP,
India 1 |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|